menu

Viewing a Job’s BHAs

BHAs The BHAs page allows for the viewing, creation, and management of a job’s BHAs

Viewing BHA Runs

Selecting the BHAs tab will display all of the BHAs associated with the job. This includes BHAs that have already been run along with any BHAs that have been created but not yet run. Displayed with each BHA is a summary of it’s activity including:

  • Date/Time and depth In the hole
  • Date/Time and depth Out of the hole
  • Circulating Hours
  • Rotating Hours
  • Sliding Hours
  • Drilling Hours
  • Drilling/Circulating Hours
  • ROP

Creating a BHA

To create a new BHA use the green Add BHA button from the upper right hand corner of the screen. A blank BHA will be added to the BHA Runs list. To add items to the BHA use Either the Directional Summary link or the MWD Summary link.

BHA Directional Summary

Next to the BHAs name is a link to the Directional Summary. Notice that the current status of the BHA appears in paraenthesis as well. This shows if the BHA is currently open or if it’s directional run has been completed.

Clicking the Directional Summary link brings up the Detailed BHA Screen. Here detail such as BHA name, Distance to bit, and drilling hours can be managed.

The Run Report section gives detailed information about this BHA’s run. Below the Run Report Is a graphical representation of the BHA along with the list of tools that make up the BHA. Items on the BHA can be rearranged via drag and dropping items in the tool list.

Adding Assets to a BHA

Add Assets The Add Asset button brings up the window that shows avaliable Assets that can be added to the BHA. Use the Select button for any asset to add it to the BHA.

Adding Rig Items to a BHA

The Add Rig Item button is used to add Rig Items to a BHA. Select the appropriate rig item Type and input the Length of the item. When the Save button is clicked the item will be added to the BHA.

BHA MWD Summary

Next to the BHAs name is a link to the MWD Summary. Notice that the current status of the BHA appears in paraenthesis as well. This shows if the BHA is currently open or if it’s directional run has been completed.

Clicking the MWD Summary brings up a MWD focused BHA Screen. Here Distances From Bit can be entered by Selecting the appropriate Type and entering a Desc and Dist.

Just like on the BHA Directional Summary page, Assets and Rig Items can be added to the BHA using their respective buttons. Items on the BHA can be rearranged via drag and dropping items in the tool list.